Home > Business Area > Others

Others

Shanggao Industrial Park Distributed Energy Resources Project in Jiangxi Province, China



The project is equipped with two PG6581B-type gas turbines, two HRSGs and one steam turbine generator, with a total installed capacity of 100MW.

The project was successfully synchronized in March 2014, with the tested performance satisfying or being better than the requirements of the EPC contract.


Enterprise journal

Address:2nd Floor, Bldg.E No.1715 North Zhongshan Road, Shanghai, China
TEL:86-21-60866668
FAX:86-21-61074815 Postcode:200061


Record number: Jin ICP No.14007037