The project adopts the hybrid development model of agricultural production and PV power generation, with a total installed capacity of 35MW and with the space between PV panels for agricultural planting, effectively improving the comprehensive utilization of land. The project can save a large amount of coal and greatly reduce gas emissions, and plays a positive role in improving the local energy structure. The project was scheduled to be constructed in 2016 and put into production at the beginning of 2017.