The project is a national concession project in 2004 with a total installed capacity of 200MW and a total of 133 FL77/1500kW wind turbines located in two respective southern and northern regions. The project was rated as “2008 Standardized Project” by the China Electric Power Construction Enterprise Association and won the “2009 China Power Quality Engineering Award”.