Krabi 1×12MW Palm-shell Power Station is a captive power station of a palm oil producer, equipped with a 12MW condensing steam turbine generator and a 65t/h palm-shell fired boiler.
SINOMEC completed the construction drawing design in October 2014.
The project was completed in October 2015, satisfying all the design indicators and becoming a local demonstration project for biomass power generation.