The first phase of the project is equipped with 2×75t/h high-temperature and high-pressure CFB boilers and 1×7.5MW back pressure turbine generator, with the DFG system, DeNOx system, dust removal system and other environmental protection facilities installed simultaneously to meet the emissions criteria, with a total investment of about RMB 170 million. The project was scheduled to be constructed in 2016 and put into production in 2017.