Home > Business Area > Thermal

Thermal

Chongqing Sinogy Longqiao CHP Project


The project is equipped with 2×450t/h CFB boilers, 2×50MW back-pressure turbine generators, 1×1100t/h CFB boiler and 1×300MW steam-extracted condensing turbine generator.



The project adopts a two-level arrangement with a height difference of 12 meters and a 2km long coal conveyor trestle to the powerhouse.




Enterprise journal

Address:2nd Floor, Bldg.E No.1715 North Zhongshan Road, Shanghai, China
TEL:86-21-60866668
FAX:86-21-61074815 Postcode:200061


Record number: Jin ICP No.14007037