Situated in Carabobo of Venezuela, the project was invested and constructed by Corpoelec and PDVSA, and was launched into business operation at the end of 2012.
The project is equipped with 4×192.625 MW gas turbine generators (Siemens SGT6-5000F and ISO operator interface), fueled by main diesel and auxiliary natural gas and arranged outdoors for single cycle operation.