The first phase of the project is equipped with 3×150t/h high-temperature and high-pressure CFB boilers and 2×15MW back pressure steam-extracted turbine generators, with the DFG system, DeNOx system, dust removal system and other environmental protection facilities installed simultaneously to meet the emissions criteria, with a total investment of about RMB 450 million. The project was scheduled to be constructed in 2016 and put into production in 2017.