The project is located at the material industry concentration area of Liyang City, in the Shanghai-Nanjing-Hangzhou Industrial Belt of the Yangtze River Delta Economic Zone. The project is equipped with 3×130t/h high-temperature and high-pressure CFB boilers and 2×15MW back pressure turbine generators, with a total investment of RMB 350 million. The project has reserved a site for expansion for the consideration of economy development and more heat demand, and will have a total of five boilers and four turbine generators finally.